The Roof In Pictures

I have requests out to a couple of roofers to get estimates on this mess:


These above are the exterior part of the roof, from a recent post. 

Here's what prompted me to say "F**k it, I'm out!!" last Saturday, when I resumed tearing into the ceiling to start repairs:


You're not supposed to see daylight where the joist should be, right?  And you can see the damage to the wall header (the darker bottom wood). 


Closeup of the joist remains. The solid wood in front is, as near as I can tell, a nailer for the ceiling lath, and not part of the roof or wall structure.


I also started tearing out the lath and plaster that I'll need to be replacing. I was able to punch through what was there in these three bays, using only my gloved fists. (Purely a comment on the state of the walls, not my punching-fu!)

I haven't told Doc yest, because:
Saw PCP today. Did a "routine" EKG. Have been referred to a cardiologist. Apparently I have had a hear attack at some time in the past, maybe 8 years. hmmm
I'm thinking she has enough on her plate right now, so I'll break this to her when that's in her rear-view mirror.



Monday, December 7, 2015

Da House...

As Jack Benny used to say, "Well..."

I got the two downstairs radiators detached and their feed and return pipes capped.  This, I thought, would at least let me run the furnace and heat my bedroom.

Both God and the house said "Ha!"

I turned on the heat, and went upstairs to check things out.  There was a nice thin stream of water squirting out of the interior of the radiator.  And, whilst the system was pressurized,  rain began falling from the decorative(?) beam between the living and dining areas.

Let there be rain!
My suspicion is that it is the result of a pipe that burst between the ceiling and the floor upstairs.  I hope that it is one of the pipes to the closet heater, because those are relatively short sections, and I *think* I should be able to detach them at a joint near the living room ceiling.  If it is one of the pipes to/from the bedroom, oy!  They are straight, single piece pipes from the basement to the radiator, as far as I can see.

So.  Command decision is that *all* radiators are in some way dead.  Four new radiator panels and four valve sets are on order from Runtal in over in Massachusetts.  I've ordered two twelve foot UH2 panels, one for the bedroom and one for the closet.  Five foot and eleven foot UH4 panels are on order for the living and dining rooms.

Oh, and of course, there is wall repair needed where the old radiators stood as well, which really means that he downstairs needs painting.  Since heat is the priority, I plan on patching and painting the walls where the old radiators were first, then moving on to painting the entire living/dining area.  Deb had a color scheme in mind,  If I recall correctly, it was green for the living room, blue for the dining room, and red for the kitchen.  (My recollection is based on the colors of the kitchen and dining room chairs.)


The wall under the front window. NOT the worst of the two!
Someone put a 'cap' on the baseboard, because it is bowed away from the wall.
Close up of the cap.

The dining room wall, the worst of the two. This is after the first coat of fill.  Once it is completely dry, it gets sanded, a second, thin coat, final sanding, and paint.
This is the part of the floor over the dry rotted joist.  There is about an inch of gap between the bottom of the baseboard and the floor.  That is brick you see in the gap.  There was a majorly kludged patch covering it.  I think I have more shoring to do...
 In other news, I finished up weatherproofing the kitchen door.  This, of course, required some patching and painting, too, but the job is done.  Yes, the door and frame need painting, but I need to focus my attention on the walls before the radiators get here.

The improved product.
New threshold plate and coat of paint.

New weather stripping!
Next pay day, I plan on getting someone out to put in a new pane of glass in the hole covered by the cardboard.

In the mean time, the bedroom is comfy, thanks to an early Christmas present from Deb - an electric, infra-red heater!

The new heater.  It is a faux fire place, with the infra-red heater in the box underneath.  That's Suzu warming her tail.
Suzu enjoying the new 'place' by the 'fire'.
I created the place by using my old bedspread under two fleece throws I picked up for $3.00 each at WalMart.  The dogs seem to like it, and I've even noticed Baxter making use of it.

For my next trick, more outlets in the bedroom!

Oh,  an update on the last electrical post... the short in the wiring over the back bedroom migrated.  I came home to find my wireless out, because I had plugged it into the old circuit, which failed when the short migrated.  So all of those lights and outlets are dead again.

I love this place!!

Sunday, November 22, 2015

Bah Effing Humbug!!!

OK. So, I got a load of oil Friday.  No rush, figured I get the furnace going Saturday.

Here's the resulting e-mail convo:
Well, I'm shopping for heating.  I've looked at replacing the old radiators w/ similar new ones, but I don't think they'd be anywhere near 'hot' enough.  Depending on the calculator I use (and the underlying assumptions made by the coder), the downstairs (12' x 25' x 9') needs anywhere from 12,000 to 20,000 BTUs/hour to stay warm!  The replacement 'old fashioned' radiators put out about 900 BTU/H.
From what I can tell so far, the Runtal vertical rads can do the job,  The ten pipe puts out 1400 BTU/H/ft, so two 8 foot panels should do the trick. Here's a link to the product page, and I've attached the PDF brochure. Their site has a boatload of information, everything except pricing. These would be special ordered, altho it seems that they do it on a regular basis.  The 'replacement' radiator is on the order of $500.00.  I can't guess what these might cost.
Did you get the pix I sent of the dead ones? For now, I'm toying with the idea of moving the one in the kitchen out to the living room.  Some heat would be better than none.  I just hope it doesn't fail like the other two.
Bah effing Humbug.
On 11/22/2015 3:19 PM, Deb wrote:
OOPS! missed the info that the radiators needed replacing. If we can make the budget work, I think these vertical ones would be best. Find out how much and how soon. I'll see what I can do about money.

Meanwhile, wear layers. I'm told it helps. :)
Had trouble sending from my phone.

Here are the pix.  This explains all of the water pouring into the basement around the feeder pipes when I turned the heater & water on.

Dining room

Living room
Can't get one of the fittings to budge, so I'm just going to get an 1-1/2" cap tomorrow.

Did I mention it will be below freezing tonite?

Yeah.  Good times.

Tuesday, July 14, 2015

More House (Garden, Not So Much)!

OK.  I know it's been almost  two weeks since I last posted about the house.  I have been busy.

First, I've installed two ceiling fans in the living/dining area. It's 80 outside, I just came back from getting lunch, and the downstairs is comfortably cool.  Without the A/C.

Pre-installation.

Installed and working!
Aaaand, the kitchen sink:


This started out with a friendly notice from the boro that my water usage was higehr than usual.  The hot tap was leaking, enough so the the faucet was hot to the touch.  So, off I go to get a new faucet set.  When I got home and crawled underneath, I saw things I did not want to see - a tangle of water lines, set screws, and what looked like solder.  Command decision - remove the old sink in toto, and replace w/ new.

I won't bore you with the tale of the sturm und drang needed to remove the add-in shelf so I could get the drain connected, required by the offset drain configuration. Nor will I talk about the holes drilled in said shelf so that the water supply pipes could be run thru them and then soldered together.  I mean, who would ever want to replace a sink or need to move anything, right?

In happier news, those are tomatoes from the garden.

The last major thing is getting the new room finished. "Finished" is still a ways off, but progress abounds! I've painted the ceiling and three walls, scraped the windows, and taped them off so I can start painting them.

The almost-but-not-quite-corner. This shot does give you a good sense of what "Modern Grey" looks like
This is a test. I'm painting the inner part of the frame Modern Grey, the rest of the frame and sill white. If I like it, I'll do all three the same.  If not, plain white.

One window, taped for painting.  I wound up putting filler along the left side, between the wall and frame. Sand tomorrow, then wipe down and paint!

Benny came in to inspect. Notice that the debris is gone!
And, in the midst of all this, we have a new resident. She showed up on the neighbor's porch Sunday evening before last.  I thought she was a kitten, but when I took her to the vet, they wanded her and found out that she has been chipped, her name is Ramen, and she's 12!

I haven't heard from the owner, but I did talk to the alternate contact, who seemed put out by the whole experience. So, it's looking like me, three dogs, and three cats.

Behold, Ramen:

(She can be shy at first...)

Ramen T. Cat
Her right ear is 'cocked' to almost horizontal, due to a large mass at the base of the ear. It looks like it had been treated, or at least biopsied, because there is a shaved spot, and a nicely-healing cruciform wound.

She's a little bitty thing, weighing in at only 5 lbs. And I think she has Nadia on the run.

Tuesday, June 9, 2015

Love/Hate Relationships Updated!

Update:  Last night, I was noodling about with some possible solutions to the new bedroom situation that didn't entail a) kludges, b) lots of destruction and rebuilding. The thought occurred: "Skin the existing wall with drywall!" I figured that was a good compromise to  my problem and met my requirements.

Today, I was overjoyed to discover that there is such a thing as 1/4" thick drywall! Several of the reviewers at Home Depot said it was an excellent way to cover old walls.

So, I am now the proud owner of three 4' X 8' X .025" sheets of drywall, plus accoutrements. And if I have to do this again, I'm paying someone to pick up and deliver the stuff!
 </update>

The Flight Attendant Girl Friend introduced me to working on old houses when she bought her house back when we were dating in the last century:

(Courtesy Google Street View.)
 It was built, as near as we could tell, in the late 1910s or early 1920s.  Working on it proved the rule that, when estimating the time required for a project you should give it your best estimate, double that, and then bump it to the next higher unit of measure.  So, for example, a three day job takes one month. ( 2X3 days = (about) 1 week, next unit of measurement is a month, ergo, 1 month.)

When I worked on my own (newer) places, the law pretty much still held, but those places had far fewer surprises.  No interesting dry rot in the bathroom that was (supposed to be) the three day job. No electrical that followed the evolution from Edison to modern code compliance. Needless to say, I learned lots.

Flash forward to today. I have decided to move my bedroom from the back room of the third floor to the front room of the second. This reduces the possibility of damage from a leaky roof (it's getting fixed next week!), and more importantly, puts me in a room that has heat from the boiler/radiator system, rather than relying on the (very, very) expensive wall heater.

So, I decided that I wanted to spruce the place up a bit by painting it. Relatively easy and cheap. Wash the walls, floor and ceiling, pull out all of the old, useless hardware, patch some spots on the wall, and paint. The goal was to have the ceiling, walls and trim done by Wednesday (tomorrow).

There has been, in the words of every airline everywhere, a delay.  Observe:

This...
...turned into this...
...resulting from this...
...and this!
Scraping one little bit started to pull up goodly sized strips of painted-over wallpaper. I admit, there was something satisfying about  the way all that effing wallpaper came off so easily. (I really, really hate wallpaper.)

And, as I had expected, we're dealing with lath and plaster:

You can see to bits of lath poking out above.
And there is a bit of a gap between the wall and ceiling:


Given the gaps at the ceiling, and at the wall,


...I'm starting to toy with the idea of pulling out that the lath & plaster, and replacing it with drywall.

What could possibly go wrong??

Saturday, January 19, 2013

This Old House, Again...

Remember the leak?  That well-hidden, inaccessable leak??

Yeah.

The leak is not anywhere where I can see the pipes.  The two-story add-on is behind the basement, so the pipes for the kitchen heater go through the basement wall.  The only way to access them is through the kitchen floor.  Two days ago, the linoleum bubbled up in front of the sink.  And, it's slowly growing.  Sigh.  It's starting to look like I will have to take up the linoleum, then the sub floor, to find the source(s) of any leaks.  Experience (hard mistress that she is) tells me that I will probably have to do some work on the floor joists too, at a minimum.  Just for drill.

So, in roughly the order of priority for the lovely old place:
  • New roof, all over
  • Find/fix leaks under the kitchen
  • Un-sag the laundry room (the add-on part is tipping away from the rest of the house)
  • Permanent electricity for the second and third floors
  • Shore up the first floor joists to level the first floor.
  • 'Artfully' shore the second floor (and hope that levels the third floor)
  • Re-model kitchen
  • Re-model bath
  • Make the back yard a thing of beauty.
That all should keep me busy and broke.